Workshop “De Zuidhoek”
Workshop “De Zuidhoek” in Zierikzee previously consisted of different production halls with limited office space. The shops were outdated and people complained about the high indoor room temperatures during the summer period. Therefore the building was completely renovated, connecting the production halls with a “light street” and by adding a new two storey office block in front of the production halls. PDE developed the chilled water plant, piping and cooling systems of the workshops and office block. The HVAC power distribution and control system is designed by PDE integrating the existing and the new HVAC systems. The HVAC interface is designed as a web based portal.
Photo: Offices and entrance
Photo: Electronica workshop